You are here:

Support the development of tomorrow’s infrastructure

And reap the benefits today.

And there’s more

Increased land value
Fastned develops the location (e.g., free grid connection).

Increased traffic

Fastned brings attractive customers for adjacent businesses who have time and money to spend.

Increased sustainability
Fast charging boosts your sustainability profile and checks ESG, CSRD and SDG criteria.

Drive the future from the backseat, we do all the work

Landowners

You own a piece of land and want to generate long-term income without investment or involvement.

Retail, Food & Beverage

You’re interested in fast charging at your location or can add value to existing stations.

Developers & Investors

You have a piece  of land on which Fastned might develop (co-development possible).

Governments

You’d like to offer fast charging in your region.

Public Works

You want to add fast charging to new or existing infrastructure.

Brokers & Intermediaries

You’d like to help with the expansion of our network.

Suggest a location to Fastned

Requirements

  • Traffic volume: max. 3 minutes from high-traffic road (≥25.000 cars per day).
  • Lot size: min. 10×7,5 m² or 15×5 m²; preferably 40×25 m² or more.
  • Accessibility: 24/7 from public road.



Preferences

  • Amenities: ≤3 minutes walking from food, drink or toilet facilities.
  • Visibility: visible from high-traffic road.
  • Grid connection: preferred but not required.

Form for location partners

Get in touch

Want to hear more about the benefits and possibilities of hosting a Fastned station? Get in touch by submitting a location or shoot us an email at [email protected] and we’ll get back to you.

Stations for every location

Drive-through stations

Fastned’s award-winning drive-through  stations are safe, quick and fit for all types of vehicles. These in & out layouts therefore offer the best possible experience.

Parking stations

Our parking layouts offer a solution when drive-through stations are not possible.

Uncovered stations

When covered stations are not possible, Fastned can also build stations without a canopy.

Income without involvement

If you’re a private or public landowner, you can secure a steady stream of revenue by renting out or selling a piece of land to Fastned. We’ll take care of everything else—unless you want to co-develop.

  • Lease: ≥15-year contract, preferably 20 years or longer (direct purchase possible).
  • Payout: paid in advance according to your preferred frequency (e.g., quarterly).
  • Price: based on lot size and real-estate value (partial revenue share possible based on station revenue).

 

 

We do all the work (and we’re really good at it)

From contracts and permits to managing the construction and operation of the stations, Fastned handles the entire process. Founded in 2012, we have over a decade of experience in smoothly turning pieces of land into future-proof locations, with 350+ stations and counting. All with minimal involvement from the landowner’s side.

Invest in the future, without having to invest

By letting us lease or buy a piece of land, you’re supporting the development of sustainable infrastructure. Fastned covers all costs. If you want to develop a site with us, co-investment is possible too.

Increase real-estate value while we’re at it

As we develop the site to operate a fast-charging station, we increase the value of your land. 

  • Free grid connection: free for use after lease period.
  • Safety and environmental upgrade: we’re making the location fit for cars and people in accordance with the latest standards.
  • Foundation work: we’ll do all necessary work so that the land is ready for development after the lease.

 

Invest in the future, without having to invest

By letting us lease or buy a piece of land, you’re supporting the development of sustainable infrastructure. Fastned covers all costs. If you want to develop a site with us, co-investment is possible too.

Why we need fast-charging stations, fast

Since 2012, Fastned’s been leading the charge in building a European fast-charging network. At our stations, people can charge up to 333 km in 10 minutes. That makes a world of difference compared to charging on the street  or at home, where charging can take all night.

Because more and more EVs are coming with increasingly larger batteries, fast-charging stations are indispensable in scaling our infrastructure. By accelerating electric driving, our stations meet the growing charger demand and contribute to curbing climate change.

Hear from our location partners, don’t just take our word for it

Hear from our location partners, don’t just take our word for it

“First testimonial  lorem ipsum dolor sit amet”

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat.

“Second testimonial  lorem ipsum dolor sit amet”

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat.

“Third testimonial  lorem ipsum dolor sit amet”

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat.

Stations for every location

Thanks to our iconic, modular station design, our in-house team of architects can build stations anywhere.

Drive-through stations
Fastned’s award-winning drive-through  stations are safe, quick and fit for all types of vehicles. These ‘in & out’ layouts therefore offer the best possible experience.

Parking stations
Our parking layouts offer a solution when drive-through stations are not possible.

Uncovered stations
When covered stations are not possible, Fastned can also build stations without a canopy.

≥20 years guaranteed income

15-year minimum; direct purchase possible.

Zero hassle

Fastned takes care of everything; no involvement required.

No investment needed

Fastned pays everything (co-development possible)

Increased land value

Fastned develops the location (e.g., free grid connection).

Increased traffic

Fastned brings attractive customers for adjacent businesses who have time and money to spend.

Increased sustainability

Fast charging boosts your sustainability profile and checks ESG, CSRD and SDG criteria.

Drive the future from the backseat We'll do all the work

Landowners

You own a piece of land and want to generate long-term income without investment or involvement.

Retail, Food & Beverage

You’re interested in fast charging at your location or can add value to existing stations.

Developers & Investors

You have a piece  of land on which Fastned might develop (co-development possible).

Governments

You’d like to include fast charging in the development of an area or piece of land.

Public Works

You want to add fast charging to new or existing infrastructure.

Brokers & Intermediaries

You’d like to help with the expansion of our network.

Income without involvement

If you’re a private or public landowner, you can secure a steady stream of revenue by renting out or selling a piece of land to Fastned. We’ll take care of everything else—unless you want to co-develop.

  • Lease: ≥15-year contract, preferably 20 years or longer (direct purchase possible).

  • Payout: paid in advance according to your preferred frequency (e.g., quarterly).

  • Price: based on lot size and real-estate value (partial revenue share possible based on station revenue).

We do all the work (and we’re really good at it)

From contracts and permits to managing the construction and operation of the stations, Fastned handles the entire process. Founded in 2012, we have over a decade of experience in smoothly turning pieces of land into future-proof locations, with 350+ stations and counting. All with minimal involvement from the landowner’s side.

 

Invest in the future, without requiring investments

By letting us lease or buy a piece of land, you’re supporting the development of sustainable infrastructure. Fastned covers all costs. If you want to develop a site with us, co-investment is possible too.

Increase real-estate value while we’re at it

As we develop the site to operate a fast-charging station, we increase the value of your land. 

  • Free grid connection: free for use after lease period.

  • Safety and environmental upgrade: we’re making the location fit for cars and people in accordance with the latest standards.

  • Foundation and remediation work: we’ll do all necessary work so that the land is ready for development after the lease.

Attract attractive customers

Fastned stations bring new and repeat customers to nearby places to eat, drink and shop. EV drivers are an attractive class of consumers as they have more time and money to spend than the average driver. By attracting EV drivers to your location, you increase revenue for adjacent businesses.

Why we need fast-charging stations, fast

Since 2012, Fastned’s been leading the charge in building a European fast-charging network. At our stations, people can charge up to 333 km in 10 minutes. That makes a world of difference compared to charging on the street  or at home, where charging can take all night.

Because more and more EVs are coming with increasingly larger batteries, fast-charging stations are indispensable in scaling our infrastructure. By accelerating electric driving, our stations meet the growing charger demand and contribute to curbing climate change.

Why we need fast-charging stations, fast

Since 2012, Fastned’s been leading the charge in building a European fast-charging network. At our stations, people can charge up to 333 km in 10 minutes. That makes a world of difference compared to charging on the street  or at home, where charging can take all night.

Because more and more EVs are coming with increasingly larger batteries, fast-charging stations are indispensable in scaling our infrastructure. By accelerating electric driving, our stations meet the growing charger demand and contribute to curbing climate change.